Aleco NeoCor Manual de usuario

Busca en linea o descarga Manual de usuario para Herramientas Aleco NeoCor. Aleco NeoCor User Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 5
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
NeoCor
Installation Instructions
PARTS INCLUDED:
TOOLS NEEDED:
Cam Rollers
V-cam Bearings
Doors
#8 x
1/2 Screws
1/4”-20 x 2”
Bolts
Lock Washers
Marker / Center Punch
Drill with 5/16” , 5/32, & 3/8 Bits
Adjustable Wrenches
Flat-head Screwdriver
Step Stool or Ladder
Tape Measure
Utility Knife
KIT CONTENTS
[1] V-Cam Top Bearing [1] Jamb Guard
[1] Cam Roller
[1] Door Panel
[4]
#8 x 1/2” Screws
[1]
1/4”-20 x 2” Bolt
[2]
Jamb Nuts
[6]
Lock Washers
Bottom Bearings
3/8” - 16 Thread Tap
Jam/jointfilesconvert/1447628/bguards
[1] Bottom Bearing
[6]
3/8”-16 x 7/8 Bolts
[1] Bottom Hinge Cover
[1] Top Hinge Cover
3/8”-16 x 7/8 Bolts
All quantities shown for single door only. For bi-parting applications, multiply all quantities by 2.
Jamb Nuts
#8 x 3/4” Screws
#8 x
3/4” Screws
[10]
TM
Vista de pagina 0
1 2 3 4 5

Indice de contenidos

Pagina 1 - Installation Instructions

NeoCor Installation Instructions PARTS INCLUDED: TOOLS NEEDED: Cam RollersV-cam BearingsDoors#8 x 1/2” Screws1/4”-20 x 2” BoltsLock WashersMarker /

Pagina 2 - 1 Doorway Preparation

Header is LevelAttach TopMounting AngleCenter PlumbLine on JambAttach JambGuardJamb isPlumbStep 1 Doorway Preparation1.1 Inspect. If carton or door

Pagina 3 - 2 Door Installation

Jamb Guard3/8” x 2” Masonry AnchorsPivot Door Into Placeover Mounting HolesInsert Pivot PinStep 2 Door Installation2.2 Make sure the top Vcam is pl

Pagina 4

Step 3 Adjustments and Final Assembly 3.1 Check the door for correct vertical position by making sure that the door seals againstthe top of the jamb

Pagina 5 - BOTTOM OF DOOR OPENING

13 1/4"BOTTOM OF DOOR OPENING

Comentarios a estos manuales

Sin comentarios